Construction Pictures

Started May 2002

Back to the Idaho Property Page

Previous page 2 of 3 Next

Hydrant at Garage Trench to Garage Trench to Well Septic System Hookup Sewerline to Garage
Sewer Line to House Overview Backfilling the Garage Back Corner Looking Toward the Spring Back Corner of Garage
Air Power and Data into the House Garage Bath Rough In Garage Bath Rough In Cutting in a trail Cutting in a Trail
Front Corner of Garage Water From the Well Black 
Water to the Garage Blue Site Overview Site Overview Sand for Slab Prep
Dumping Sand Dumping Sand Overview of House Finishing the Garage Slab Master Bath and Powder Room Rough in
Kitchen and Utility Room Rough in Combustion Air for Wood Stove Sewer exit from the House Utility Room Rough in Pond from Spring
Garage Bath Rough in Garage Slab Screen Porch Finishing Bath Rough in for Garage View Down the Driveway from inside the Garage